Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jun 01, 2023     Forward engine control bracket - (5 hours)       Category: Engine
Completed installation of oil temp control cable and installed control arm to butterfly valve. Checked for full travel and applied torque seal to pass through bolts. Installed nut plates to F-746 fwd engine control bracket for adel clamps that will secure the engine control cables. Match drilled F-746 to lower portion of the subpanel and clecoed in place. I then installed the subpanel and adel clamps for the cables. Still not sure about the throttle cable as it is still too taught to reach an Adel clamp on the F-746 bracket. Called in to Vans to try and resolve and will update later. Installed the engine sensor wires to the SV-EMS to verify clearance with the connectors and it looks good.


 